Capabilities

Contaminated Sediment Remediation

Award-winning Leadership

For more than a quarter century, Lally has quietly been leading some of the most important developments in the North American sediment remediation sector. Among these the engineering and implementation of precision dredging and capping technologies and methods; electronic positioning and monitoring systems; contour dredge prism and engineered cap design standards; site characterization technology and methods; integrated remediation and ecosystem restoration; and quality control, mapping products, data analytics and software tools to measure, benchmark and improve sediment remediation performance.

Lally’s innovations and education efforts are dedicated to achieving Maximum Remediation at Minimum Cost in order to do the greatest good for our clients and the environment.

Lally LLC provides remediation site owners, managers, regulators, contractors and consultants a broad range of sediment remediation services geared towards completing projects with superior cost efficiencies and minimized risk.

Since 2008 Lally LLC has completed the following sediment remediation project services;

Lally LLC is a pacesetter in the Planning, Engineering and Operational Performance aspects of contaminated sediment remediation projects.

Lally has worked on over 1,000 dredging and marine construction projects involving hydraulic and mechanical dredge types, and served in leadership roles at numerous sediment remediation sites as consulting engineer and marine contractor. Important experience has been gained in the process, which Lally wants to share with clients, regulators and consultants in the ongoing pursuit of clean waterways and restored aquatic ecosystems.

Lally’s work and education efforts have helped advance the sediment remediation industry and been instrumental in the cleanup of numerous projects at some of the largest and most complex contaminated sediment sites in North America, including;

In the late 1990s, working as Marine Remediation Engineer helping plan large contaminated site remediations at New Bedford Harbor, MA, Hudson River, NY, Lower Duwamish Waterway, WA, and Commencement Bay, WA, Lally recognized that the marine equipment available for complex and costly sediment remediation projects in these regions were limited to derrick (crane) barges with wire-controlled clamshell buckets, and hydraulic cutterhead dredges. Both of these types of conventional dredge systems, even with ‘environmental’ attachments, are unsuitable for a range of reasons related primarily to horizontal and vertical cutting accuracy, spillage (residuals), water generation, and access.

In the late 1990s-2001, as Dredging Technical Lead on several projects including New Bedford Harbor Superfund Site, Hudson River, and Boeing Plant 2 projects, Lally postulated, proposed to U.S. EPA Region 1 and USACE – New England District, designed and managed the first precision dredging project using RTK-GPS positioning and level-cut sealed environmental bucket in North America at the New Bedford Harbor Superfund Site. As specified by Lally and coordinated with leading U.S. and Dutch dredging contractors, this was also the first ever Shallow-draft Hybrid Mechanical – Hydraulic Transport Dredge assembled and demonstrated. In 2000-2001, as Site Design Engineer and Construction Manager, Lally oversaw engineering and construction implementation of the first precision thin-layer capping methods at the Ward Cove Superfund Site in Alaska.

A range of environmental dredging and capping approaches were developed on these two landmark projects;

To advance industry knowledge, beginning in 2001, Lally began educating the sediment remediation community of these environmental dredging and capping breakthroughs, with delivery of numerous presentations, teaching sessions and guidance documents. These engineering design and technology initiatives were broadly adopted, and since served as the basis for most contaminated sediment remediation projects in North America.

Lally LLC continues to lead development and implementation of precision dredging and capping platforms, next-generation dredge and bucket guidance systems, correlative precision dredge prisms, sampling campaigns, and situ and remote measurement and quality control systems. We regularly achieve overall dredging accuracies within 0.15 ft. of target elevation for our clients, as well as high production thin-layer capping, with greater and greater efficiency saving projects substantial capital in attaining site cleanup goals.

Partnering with our clients and oftentimes multi-disciplinary teams and federal and state regulators, Lally LLC plans complex sediment remediation projects with essential data, advanced modeling, engineering and construction know-how, to achieve cleanup goals with optimal performance, safety and cost savings.

Experience has shown that thorough and accurate site characterization studies are required in order to successfully complete sediment remediation projects. Lally LLC provides authoritative knowledge on the physical and environmental parameters important to achieve project success.

We offer a range of site data acquisition, analysis and mapping services to delineate contaminant inventory, characterize physical properties (i.e. geotechnical, debris), assess advection/diffusion processes related to contaminant transport and cap design, and bring overall clarity during the project formulation and pre-design phases to establish solid foundations for engineering design, contracting and construction implementation.

We offer the following contaminated sediment project planning services worldwide;

Lally’s innovative and reliable remedial design approaches incorporate comprehensive understanding of geotechnical, chemical, hydrodynamic and sediment transport processes, environmental and other critical site conditions information, alongside industry-leading knowledge of environmental dredging, materials transport, processing and placement equipment and methods.

To minimize risk we develop Contract Plans and Specifications to be detailed, accurate, and without ambiguity. We establish appropriate conventional and specialized dredging, capping, enhanced natural recovery, and associated technologies, post-dredge sampling and SWAC calculations to achieve project cleanup goals as cost-effectively as reasonable.

As a pioneer in the development of precision contour dredge and capping equipment and correlative plans and prism files, we know how to temper optimal equipment types and sizes with appropriate resolution, offsets and tolerances considering site conditions. Lally has been teaching consulting engineers and contractors the fundamentals of precision dredging and capping approaches since the early 2000s and is often brought in to help setup prism designs and tune equipment to resolve residuals, cleanup efficiency, overdredging or production issues. We also have significant hydraulic dredging engineering experience to be able to design or specify appropriate hydraulic dredge types, cutterheads, pump and pipeline systems, and automation controls as conditions warrant.

Further, Lally has deep experience in the design and operation of Shallow-Draft Precision Mechanical – Hydraulic Transport Hybrid Dredges, a system with several significant performance benefits at many larger contaminated sediment sites with restricted access.

Lally-offered Remedial Design and Engineering services include;

These experience-based services have saved our sediment remediation clients hundreds of millions of USD dollars.

“Lally provided the project with innovative thinking, designs, and consistently educated the project team on the concepts and technical specifics of cleanup efficiency, dredge volume reduction, production optimization, and quality control that ensured project success. Overall these items and others resulted in a project cost savings on the order of $100M.”

– Superfund Mega-site Project Manager

Remedial construction projects can be challenging, for a lot of reasons. With over 30 years’ experience as marine remediation contractor and consulting engineer, Lally understands the nuances and potential pitfalls on remediation construction projects, and excels in promoting performance, integrity, and safety.

In the lead-up to and during construction, Lally LLC can contribute as Project Manager, Owner’s / Contractor’s Representative, or 3rd Party Technical Advisor. Whether engaged from beginning to end, or at certain points, we identify varied ways to improve performance on contaminated sediments sites, and work collaboratively with project teams to optimize, and resolve project technical and contractual challenges.

Examples of construction-phase services recently completed by Lally LLC, mostly on Superfund Mega-sites, include;

Lally is glad to help you realize better performance, risk management and cost savings on your next sediment remediation site.

In 2020, the U.S. Environmental Protection Agency (USEPA) presented Lally with the USEPA Administrator’s Award for Outstanding Accomplishments by a Small Business Contractor for its leadership in remedial plan formulation, engineering, and technical oversight of precision dredging technologies and design, subaqueous caps, and dredge materials management, as nominated by USEPA Region 1 and selected by an awards panel of EPA representatives across the Agency.

Practical Expertise

Let's Stay in Touch

Join our Mailing List for Occasional News and Announcements.